RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1305013867 - Archived data from Thu, 27. October 2016 12:06:58 CEST


This is all the information about APD 1305013867. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1305013867
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 443.2 V
Voltage for Gain 100 (T=+25°C): 415.2 V
Dark current: 8.49 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 293
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 301
Position in grid: 18
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:04 CET jreher Updated box and position via API.
11. Aug 2020 17:40:49 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:10 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:21 CET jreher Updated APD location via API.
25. Nov 2019 17:31:41 CET jreher Updated box and position via API.
11. Nov 2019 15:43:03 CET spankonin Updated APD location via API.
15. Oct 2019 10:59:39 CEST jgrochowski Updated APD batch assignment via API.
29. Nov 2016 11:53:51 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:31:59 CET markus.moritz Entered shipped after irradiation date.
02. Nov 2016 14:29:36 CET markus.moritz Entered shipped after irradiation date.
31. Oct 2016 11:49:32 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:06:58 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:25 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:40:59 CEST Tobias Imported from Hamamatsu datasheet.