RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1305013864 - Archived data from Tue, 11. August 2020 17:40:26 CEST


This is all the information about APD 1305013864. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1305013864
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 439.4 V
Voltage for Gain 100 (T=+25°C): 411 V
Dark current: 7.89 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 290
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 301
Position in grid: 15
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: 29. Nov 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 411.3848819 V     T = -25 °C: 374.9115635 V
Voltage for Gain 150: T = +20 °C: 419.3348119 V     T = -25 °C: 382.7508257 V
Voltage for Gain 200: T = +20 °C: 423.7475211 V     T = -25 °C: 387.0930255 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.441991886 V-1     T = -25 °C: 4.653655587 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.601197435 V-1     T = -25 °C: 9.231431951 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.91301148 V-1     T = -25 °C: 14.44283321 V-1
Break-through voltage: T = +20 °C: 438.0756848 V     T = -25 °C: 403.0919966 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:45 CET jreher Updated box and position via API.
11. Aug 2020 17:40:26 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:43 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:51 CET jreher Updated APD location via API.
25. Nov 2019 17:31:30 CET jreher Updated box and position via API.
22. Oct 2019 14:32:01 CEST spankonin Updated APD location via API.
15. Oct 2019 11:02:54 CEST jgrochowski Updated APD batch assignment via API.
29. Nov 2016 11:53:51 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:31:59 CET markus.moritz Entered shipped after irradiation date.
02. Nov 2016 14:29:36 CET markus.moritz Entered shipped after irradiation date.
31. Oct 2016 11:49:32 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:06:58 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:25 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:40:59 CEST Tobias Imported from Hamamatsu datasheet.