RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1305013858 - Archived data from Tue, 29. November 2016 11:53:51 CET


This is all the information about APD 1305013858. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1305013858
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 443.1 V
Voltage for Gain 100 (T=+25°C): 415.3 V
Dark current: 8.93 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 357
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 301
Position in grid: 10
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: 29. Nov 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 350 V     (not connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:45:24 CEST oafedulidis Updated box and position via API.
16. Apr 2021 22:01:11 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:34:08 CET jreher Updated box and position via API.
08. Oct 2020 18:15:37 CEST jreher Updated APD location via API.
17. Aug 2020 14:32:47 CEST vwerner Updated APD batch assignment via API.
29. Nov 2016 11:53:51 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:31:59 CET markus.moritz Entered shipped after irradiation date.
02. Nov 2016 14:29:36 CET markus.moritz Entered shipped after irradiation date.
31. Oct 2016 11:49:32 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:06:58 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:25 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:40:59 CEST Tobias Imported from Hamamatsu datasheet.