RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1304013835 - Archived data from Fri, 16. April 2021 22:01:10 CEST


This is all the information about APD 1304013835. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1304013835
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F14
Break-through voltage: 444.9 V
Voltage for Gain 100 (T=+25°C): 417.3 V
Dark current: 8.34 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 357
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 300
Position in grid: 8
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 26. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 417.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 417.4766558 V     T = -25 °C: 380.8478572 V
Voltage for Gain 150: T = +20 °C: 425.3684023 V     T = -25 °C: 388.7039078 V
Voltage for Gain 200: T = +20 °C: 429.7509721 V     T = -25 °C: 393.0743559 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.414642127 V-1     T = -25 °C: 4.662300816 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.626454391 V-1     T = -25 °C: 9.236697687 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.93525921 V-1     T = -25 °C: 14.39732248 V-1
Break-through voltage: T = +20 °C: 439.9711294 V     T = -25 °C: 408.8859037 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:45:24 CEST oafedulidis Updated box and position via API.
16. Apr 2021 22:01:10 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:34:07 CET jreher Updated box and position via API.
08. Oct 2020 18:15:37 CEST jreher Updated APD location via API.
17. Aug 2020 14:32:47 CEST vwerner Updated APD batch assignment via API.
03. Nov 2017 16:12:38 CET markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:35:47 CEST markus.moritz Entered irradiation information.
29. Sep 2017 14:20:10 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:24 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:40:58 CEST Tobias Imported from Hamamatsu datasheet.