RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1302013638 - Archived data from Wed, 22. June 2016 15:39:44 CEST


This is all the information about APD 1302013638. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1302013638
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 444 V
Voltage for Gain 100 (T=+25°C): 415.2 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 357
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:45:24 CEST oafedulidis Updated box and position via API.
16. Apr 2021 22:01:11 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:34:07 CET jreher Updated box and position via API.
08. Oct 2020 18:15:37 CEST jreher Updated APD location via API.
17. Aug 2020 14:32:47 CEST vwerner Updated APD batch assignment via API.
27. Oct 2017 10:38:24 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:30:20 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:36:18 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:18 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:44 CEST Tobias Imported from Hamamatsu datasheet.