RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1210013417 - Archived data from Tue, 11. August 2020 17:57:46 CEST


This is all the information about APD 1210013417. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1210013417
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 435 V
Voltage for Gain 100 (T=+25°C): 406.8 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 303
Position in Box: 49
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 283
Position in grid: 5
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 406.8 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 407.6675877 V     T = -25 °C: 370.867185 V
Voltage for Gain 150: T = +20 °C: 415.6405583 V     T = -25 °C: 378.8017429 V
Voltage for Gain 200: T = +20 °C: 420.0570069 V     T = -25 °C: 383.2142821 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.292549313 V-1     T = -25 °C: 4.583126034 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.131598 V-1     T = -25 °C: 9.014686949 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.10587295 V-1     T = -25 °C: 13.89444829 V-1
Break-through voltage: T = +20 °C: 434.7634489 V     T = -25 °C: 398.4379186 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:27 CET jreher Updated box and position via API.
07. Oct 2020 15:45:05 CEST jreher Updated APD location via API.
11. Aug 2020 17:57:46 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:43 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:33 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:40 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:16 CET jreher Updated box and position via API.
27. Oct 2017 10:38:00 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:27:14 CEST markus.moritz Entered irradiation information.
29. Sep 2017 14:19:28 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:12 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:39 CEST Tobias Imported from Hamamatsu datasheet.