RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1210013416


This is all the information about APD 1210013416. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1210013416
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 430 V
Voltage for Gain 100 (T=+25°C): 403 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 303
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: 10373
   
Shipment:  
Grid number: 283
Position in grid: 4
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 403 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 404.6976282 V     T = -25 °C: 367.8268421 V
Voltage for Gain 150: T = +20 °C: 412.681136 V     T = -25 °C: 375.7489424 V
Voltage for Gain 200: T = +20 °C: 417.0848235 V     T = -25 °C: 380.1274287 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.285175 V-1     T = -25 °C: 4.62383382 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.173743854 V-1     T = -25 °C: 9.195314907 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.32414443 V-1     T = -25 °C: 14.30163784 V-1
Break-through voltage: T = +20 °C: 429.6764933 V     T = -25 °C: 393.4975397 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
05. Feb 2021 11:27:27 CET jreher Updated box and position via API.
07. Oct 2020 15:45:05 CEST jreher Updated APD location via API.
11. Aug 2020 17:57:46 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:43 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:33 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:40 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:16 CET jreher Updated box and position via API.
27. Oct 2017 10:38:00 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:27:13 CEST markus.moritz Entered irradiation information.
29. Sep 2017 14:19:28 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:12 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:39 CEST Tobias Imported from Hamamatsu datasheet.