RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1210013396 - Archived data from Fri, 03. November 2017 11:26:41 CET


This is all the information about APD 1210013396. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1210013396
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 439 V
Voltage for Gain 100 (T=+25°C): 409.7 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 347
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 282
Position in grid: 5
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:00:03 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:32:48 CET jreher Updated box and position via API.
17. Aug 2020 13:44:44 CEST vwerner Updated APD batch assignment via API.
11. Aug 2020 17:54:32 CEST jreher Updated APD location via API.
03. Nov 2017 11:26:41 CET Tobias Resetted arrival for irradiation date because APD was returned to GSI un-irradiated.
29. Sep 2017 10:20:58 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:12 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:39 CEST Tobias Imported from Hamamatsu datasheet.