RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1209013363 - Archived data from Tue, 11. August 2020 17:57:45 CEST


This is all the information about APD 1209013363. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1209013363
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 447 V
Voltage for Gain 100 (T=+25°C): 418 V
Dark current: 10.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 303
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 280
Position in grid: 14
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 418 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 418.2309941 V     T = -25 °C: 381.0710054 V
Voltage for Gain 150: T = +20 °C: 426.2733944 V     T = -25 °C: 389.0488597 V
Voltage for Gain 200: T = +20 °C: 430.7387454 V     T = -25 °C: 393.4838543 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.441032941 V-1     T = -25 °C: 4.517747856 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.502412852 V-1     T = -25 °C: 8.778432323 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.6120488 V-1     T = -25 °C: 15.34686521 V-1
Break-through voltage: T = +20 °C: 439.9779254 V     T = -25 °C: 409.5928833 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:27 CET jreher Updated box and position via API.
07. Oct 2020 15:45:04 CEST jreher Updated APD location via API.
11. Aug 2020 17:57:45 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:43 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:33 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:40 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:16 CET jreher Updated box and position via API.
27. Oct 2017 10:38:16 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:26:37 CEST markus.moritz Entered irradiation information.
29. Sep 2017 14:18:16 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:11 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:38 CEST Tobias Imported from Hamamatsu datasheet.