RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1209013354 - Archived data from Wed, 07. October 2020 15:45:04 CEST


This is all the information about APD 1209013354. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1209013354
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 449 V
Voltage for Gain 100 (T=+25°C): 420.5 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 303
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 280
Position in grid: 5
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 420.5 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 420.6273663 V     T = -25 °C: 383.8993926 V
Voltage for Gain 150: T = +20 °C: 428.6217163 V     T = -25 °C: 391.8091091 V
Voltage for Gain 200: T = +20 °C: 433.0466829 V     T = -25 °C: 396.1941803 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.334618889 V-1     T = -25 °C: 4.59399513 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.158182755 V-1     T = -25 °C: 9.104107675 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.23289771 V-1     T = -25 °C: 14.09543438 V-1
Break-through voltage: T = +20 °C: 439.9910096 V     T = -25 °C: 412.3777371 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:26 CET jreher Updated box and position via API.
07. Oct 2020 15:45:04 CEST jreher Updated APD location via API.
11. Aug 2020 17:57:44 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:42 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:32 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:39 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:15 CET jreher Updated box and position via API.
27. Oct 2017 10:38:16 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:26:37 CEST markus.moritz Entered irradiation information.
29. Sep 2017 14:18:16 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:10 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:38 CEST Tobias Imported from Hamamatsu datasheet.