RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1209013349 - Archived data from Wed, 07. October 2020 15:45:03 CEST


This is all the information about APD 1209013349. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1209013349
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 446 V
Voltage for Gain 100 (T=+25°C): 418.2 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 303
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 280
Position in grid: 0
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 418.2 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 419.1114896 V     T = -25 °C: 382.1457702 V
Voltage for Gain 150: T = +20 °C: 427.0553533 V     T = -25 °C: 389.9924649 V
Voltage for Gain 200: T = +20 °C: 431.4643062 V     T = -25 °C: 394.3434646 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.509293513 V-1     T = -25 °C: 4.530872959 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.846692625 V-1     T = -25 °C: 9.011651463 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.3601796 V-1     T = -25 °C: 14.03261266 V-1
Break-through voltage: T = +20 °C: 439.9826818 V     T = -25 °C: 409.4460245 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:25 CET jreher Updated box and position via API.
07. Oct 2020 15:45:03 CEST jreher Updated APD location via API.
11. Aug 2020 17:57:42 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:42 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:32 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:39 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:15 CET jreher Updated box and position via API.
27. Oct 2017 10:38:16 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:26:37 CEST markus.moritz Entered irradiation information.
29. Sep 2017 14:18:16 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:10 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:37 CEST Tobias Imported from Hamamatsu datasheet.