RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1208013290 - Archived data from Tue, 11. August 2020 17:40:22 CEST


This is all the information about APD 1208013290. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1208013290
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 431 V
Voltage for Gain 100 (T=+25°C): 402.3 V
Dark current: 12.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 290
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 277
Position in grid: 10
Arrival for irradiation: 11. Jul 2016
Sent for analysis after irradiation: 15. Jul 2016
Return for assembly: 19. Sep 2016
   
Irradiation:  
Date: 13. Jul 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 2
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 13. Jul 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 402.7090487 V     T = -25 °C: 366.0308362 V
Voltage for Gain 150: T = +20 °C: 410.6883359 V     T = -25 °C: 373.8808933 V
Voltage for Gain 200: T = +20 °C: 415.0990065 V     T = -25 °C: 378.2285409 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.347631016 V-1     T = -25 °C: 4.633065771 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.379853997 V-1     T = -25 °C: 9.226653728 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.45718891 V-1     T = -25 °C: 14.47831429 V-1
Break-through voltage: T = +20 °C: 431.1311307 V     T = -25 °C: 394.2518509 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:42 CET jreher Updated box and position via API.
11. Aug 2020 17:40:22 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:41 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:50 CET jreher Updated APD location via API.
25. Nov 2019 17:31:28 CET jreher Updated box and position via API.
22. Oct 2019 14:31:59 CEST spankonin Updated APD location via API.
15. Oct 2019 11:02:52 CEST jgrochowski Updated APD batch assignment via API.
23. Sep 2016 09:05:21 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:35:16 CEST markus.moritz Entered irradiation information.
03. Aug 2016 16:18:04 CEST markus.moritz Entered shipped after irradiation date.
02. Aug 2016 14:59:16 CEST christopher.l.hahn Entered annealing information.
02. Aug 2016 10:45:08 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:09 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:36 CEST Tobias Imported from Hamamatsu datasheet.