RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1207013231 - Archived data from Mon, 28. September 2020 15:24:47 CEST


This is all the information about APD 1207013231. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1207013231
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 443 V
Voltage for Gain 100 (T=+25°C): 415.3 V
Dark current: 8.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 368
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 275
Position in grid: 1
Arrival for irradiation: 02. Nov 2017
Sent for analysis after irradiation: 23. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 415.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:02:10 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:35:30 CET jreher Updated box and position via API.
08. Oct 2020 18:17:42 CEST jreher Updated APD location via API.
28. Sep 2020 15:24:47 CEST vwerner Updated APD batch assignment via API.
23. Nov 2017 11:59:33 CET markus.moritz Entered shipped after irradiation date.
23. Nov 2017 11:54:57 CET markus.moritz Entered irradiation information.
02. Nov 2017 15:17:49 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:07 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:35 CEST Tobias Imported from Hamamatsu datasheet.