RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1207013230 - Archived data from Wed, 07. October 2020 15:44:49 CEST


This is all the information about APD 1207013230. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1207013230
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 445 V
Voltage for Gain 100 (T=+25°C): 416.7 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 289
Position in Box: 27
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 274
Position in grid: 19
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 22. Feb 2018
Dose used: 30 Gy
Temperature: 25 °C
Position: 3
Bias voltage: 0 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 417.6098906 V     T = -25 °C: 380.9489875 V
Voltage for Gain 150: T = +20 °C: 425.6234174 V     T = -25 °C: 388.8814012 V
Voltage for Gain 200: T = +20 °C: 430.0572432 V     T = -25 °C: 393.2857966 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.321148366 V-1     T = -25 °C: 4.598391784 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.172552603 V-1     T = -25 °C: 9.031790799 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.22880007 V-1     T = -25 °C: 14.03519994 V-1
Break-through voltage: T = +20 °C: 440.0095589 V     T = -25 °C: 408.9063412 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:35 CET jreher Updated box and position via API.
07. Oct 2020 15:44:49 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:13 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:31 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:39 CET jreher Updated APD location via API.
25. Nov 2019 17:31:24 CET jreher Updated box and position via API.
22. Oct 2019 14:31:15 CEST spankonin Updated APD location via API.
14. Oct 2019 17:33:22 CEST jgrochowski Updated APD batch assignment via API.
05. Apr 2018 12:28:45 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:29:51 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:07 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:35 CEST Tobias Imported from Hamamatsu datasheet.