RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1206013159 - Archived data from Fri, 05. February 2021 11:26:05 CET


This is all the information about APD 1206013159. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1206013159
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 426 V
Voltage for Gain 100 (T=+25°C): 399.9 V
Dark current: 12.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 293
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 271
Position in grid: 9
Arrival for irradiation: 11. Jul 2016
Sent for analysis after irradiation: 15. Jul 2016
Return for assembly: 19. Sep 2016
   
Irradiation:  
Date: 13. Jul 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 13. Jul 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 400.8253265 V     T = -25 °C: 363.7801366 V
Voltage for Gain 150: T = +20 °C: 408.847459 V     T = -25 °C: 371.6738118 V
Voltage for Gain 200: T = +20 °C: 413.2938195 V     T = -25 °C: 376.0624077 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.492928154 V-1     T = -25 °C: 4.613867887 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.799771201 V-1     T = -25 °C: 9.074535076 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.3722674 V-1     T = -25 °C: 14.16190058 V-1
Break-through voltage: T = +20 °C: 425.3938147 V     T = -25 °C: 389.0710296 V
   
Notes:


Version history

Time Author Change comment
17. Apr 2021 01:10:34 CEST jreher Updated APD location via API.
05. Feb 2021 11:26:05 CET jreher Updated box and position via API.
11. Aug 2020 17:40:49 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:10 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:22 CET jreher Updated APD location via API.
25. Nov 2019 17:31:41 CET jreher Updated box and position via API.
11. Nov 2019 15:43:03 CET spankonin Updated APD location via API.
15. Oct 2019 10:59:40 CEST jgrochowski Updated APD batch assignment via API.
23. Sep 2016 09:04:27 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:35:45 CEST markus.moritz Entered irradiation information.
02. Aug 2016 14:59:56 CEST christopher.l.hahn Entered annealing information.
02. Aug 2016 10:47:17 CEST markus.moritz Entered shipped after irradiation date.
02. Aug 2016 10:44:51 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:04 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:33 CEST Tobias Imported from Hamamatsu datasheet.