Show Hamamatsu Avalanche Photo Diode 1206013154 - Archived data from Wed, 07. October 2020 15:46:03 CEST
This is all the information about APD 1206013154. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1206013154 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | In transit to Mainz |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | D01 |
Break-through voltage: | 429 V |
Voltage for Gain 100 (T=+25°C): | 401.8 V |
Dark current: | 10.8 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 45 |
Position in Box: | 2 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 271 |
Position in grid: | 6 |
Arrival for irradiation: | 11. Jul 2016 |
Sent for analysis after irradiation: | 15. Jul 2016 |
Return for assembly: | 19. Sep 2016 |
Irradiation: | |
Date: | 13. Jul 2016 |
Dose used: | 30 Gy |
Temperature: | 25 °C |
Position: | 1 |
Bias voltage: | 320 V (connection unknown) |
Annealing: | |
Date: | 13. Jul 2016 |
Temperature: | 80 °C |
Duration: | 10 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 402.4768961 V T = -25 °C: 365.2950456 V |
Voltage for Gain 150: | T = +20 °C: 410.5046789 V T = -25 °C: 373.2389277 V |
Voltage for Gain 200: | T = +20 °C: 414.9753013 V T = -25 °C: 377.6169849 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.573931004 V-1 T = -25 °C: 4.854995789 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.064028349 V-1 T = -25 °C: 8.334884993 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.11380857 V-1 T = -25 °C: 14.88249238 V-1 |
Break-through voltage: | T = +20 °C: 429.2015833 V T = -25 °C: 391.9850652 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:53:56 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:19:44 CET | jreher | Updated box and position via API. |
07. Oct 2020 15:46:03 CEST | jreher | Updated APD location via API. |
11. Aug 2020 17:26:56 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:36:58 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:14:28 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:11:42 CEST | jreher | Updated APD location via API. |
13. Jun 2019 10:01:31 CEST | jreher | Updated APD batch assignment via API. |
23. Sep 2016 09:04:27 CEST | markus.moritz | Entered return for assembly date. |
03. Aug 2016 16:35:45 CEST | markus.moritz | Entered irradiation information. |
02. Aug 2016 14:59:56 CEST | christopher.l.hahn | Entered annealing information. |
02. Aug 2016 10:47:17 CEST | markus.moritz | Entered shipped after irradiation date. |
02. Aug 2016 10:44:51 CEST | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:28:04 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
22. Jun 2016 15:39:33 CEST | Tobias | Imported from Hamamatsu datasheet. |