RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1205013084 - Archived data from Wed, 03. February 2021 18:19:44 CET


This is all the information about APD 1205013084. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1205013084
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 437 V
Voltage for Gain 100 (T=+25°C): 408.4 V
Dark current: 8.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 45
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 267
Position in grid: 17
Arrival for irradiation: 11. Jul 2016
Sent for analysis after irradiation: 15. Jul 2016
Return for assembly: 19. Sep 2016
   
Irradiation:  
Date: 13. Jul 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 13. Jul 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 409.5958046 V     T = -25 °C: 372.6365443 V
Voltage for Gain 150: T = +20 °C: 417.5412983 V     T = -25 °C: 380.4656821 V
Voltage for Gain 200: T = +20 °C: 421.9837618 V     T = -25 °C: 384.8403431 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.312341457 V-1     T = -25 °C: 4.200037639 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.011073639 V-1     T = -25 °C: 8.656978477 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.24957722 V-1     T = -25 °C: 14.35563623 V-1
Break-through voltage: T = +20 °C: 437.3879177 V     T = -25 °C: 400.2255874 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:56 CET jreher Updated box and position via API.
03. Feb 2021 18:19:44 CET jreher Updated box and position via API.
07. Oct 2020 15:46:03 CEST jreher Updated APD location via API.
11. Aug 2020 17:26:56 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:58 CET jreher Updated APD location via API.
25. Nov 2019 17:14:28 CET jreher Updated box and position via API.
04. Jul 2019 11:11:42 CEST jreher Updated APD location via API.
13. Jun 2019 10:01:31 CEST jreher Updated APD batch assignment via API.
23. Sep 2016 09:05:44 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:36:53 CEST markus.moritz Entered irradiation information.
02. Aug 2016 15:00:12 CEST christopher.l.hahn Entered annealing information.
02. Aug 2016 10:44:37 CEST markus.moritz Entered shipped after irradiation date.
02. Aug 2016 10:43:54 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:02 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:31 CEST Tobias Imported from Hamamatsu datasheet.