RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1205013073 - Archived data from Tue, 02. August 2016 15:00:12 CEST


This is all the information about APD 1205013073. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1205013073
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A07
Break-through voltage: 440 V
Voltage for Gain 100 (T=+25°C): 412.5 V
Dark current: 7.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 267
Position in grid: 6
Arrival for irradiation: 11. Jul 2016
Sent for analysis after irradiation: 15. Jul 2016
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 13. Jul 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
17. Apr 2021 01:08:47 CEST jreher Updated APD location via API.
23. Sep 2016 09:05:44 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:36:53 CEST markus.moritz Entered irradiation information.
02. Aug 2016 15:00:12 CEST christopher.l.hahn Entered annealing information.
02. Aug 2016 10:44:37 CEST markus.moritz Entered shipped after irradiation date.
02. Aug 2016 10:43:54 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:02 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:31 CEST Tobias Imported from Hamamatsu datasheet.