RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1205013058 - Archived data from Fri, 16. April 2021 21:59:01 CEST


This is all the information about APD 1205013058. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1205013058
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 438 V
Voltage for Gain 100 (T=+25°C): 409.3 V
Dark current: 12.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 338
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 266
Position in grid: 12
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 432.1706089 V     T = -25 °C: 373.8478936 V
Voltage for Gain 150: T = +20 °C: 435.380052 V     T = -25 °C: 378.7550335 V
Voltage for Gain 200: T = +20 °C: 436.897275 V     T = -25 °C: 383.2171617 V
Gain/Voltage slope at M = 100: T = +20 °C: 9.440207245 V-1     T = -25 °C: 4.058189416 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 44.99726859 V-1     T = -25 °C: 27.99044869 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 22.2885036 V-1     T = -25 °C: 14.21733972 V-1
Break-through voltage: T = +20 °C: 434.7106148 V     T = -25 °C: 400.8913541 V
   
Notes:


Version history

Time Author Change comment
07. Feb 2022 16:17:38 CET jreher Updated APD characteristics via API.
10. Nov 2021 14:36:50 CET oafedulidis Updated APD location via API.
10. Nov 2021 14:36:37 CET oafedulidis Updated APD batch assignment via API.
16. Apr 2021 21:59:01 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:31:35 CET jreher Updated box and position via API.
07. Oct 2020 15:45:40 CEST jreher Updated APD location via API.
11. Aug 2020 17:53:48 CEST jreher Updated APD location via API.
03. Aug 2020 16:57:12 CEST jreher Updated APD batch assignment via API.
01. Aug 2016 17:28:01 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:30 CEST Tobias Imported from Hamamatsu datasheet.