RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1205013025 - Archived data from Fri, 05. February 2021 11:35:09 CET


This is all the information about APD 1205013025. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1205013025
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 435 V
Voltage for Gain 100 (T=+25°C): 407.2 V
Dark current: 10.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 365
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 265
Position in grid: 2
Arrival for irradiation: 02. Nov 2017
Sent for analysis after irradiation: 23. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 407.2 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:01:50 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:35:09 CET jreher Updated box and position via API.
08. Oct 2020 18:17:08 CEST jreher Updated APD location via API.
28. Sep 2020 15:56:38 CEST vwerner Updated APD batch assignment via API.
23. Nov 2017 11:59:25 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:41:29 CET markus.moritz Entered irradiation information.
02. Nov 2017 15:17:33 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:00 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:29 CEST Tobias Imported from Hamamatsu datasheet.