RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1204012962 - Archived data from Tue, 11. August 2020 18:10:13 CEST


This is all the information about APD 1204012962. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1204012962
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 433 V
Voltage for Gain 100 (T=+25°C): 403.6 V
Dark current: 9.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 275
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 262
Position in grid: 3
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 403.8662873 V     T = -25 °C: 367.0553684 V
Voltage for Gain 150: T = +20 °C: 411.8133526 V     T = -25 °C: 374.9497406 V
Voltage for Gain 200: T = +20 °C: 416.2329097 V     T = -25 °C: 379.3466853 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.58367941 V-1     T = -25 °C: 4.560257063 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.988375328 V-1     T = -25 °C: 8.935936409 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.886652 V-1     T = -25 °C: 13.80124722 V-1
Break-through voltage: T = +20 °C: 425.7337908 V     T = -25 °C: 395.4927749 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:23:50 CET jreher Updated box and position via API.
11. Aug 2020 18:10:13 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:37:27 CEST jreher Updated APD location via API.
21. Jul 2020 14:37:18 CEST jreher Updated box and position via API.
29. Jun 2020 16:14:06 CEST jreher Updated APD batch assignment via API.
29. Sep 2017 11:22:27 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:27:58 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:37:53 CEST Tobias Imported from Hamamatsu datasheet.