RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1201012777 - Archived data from Wed, 07. October 2020 15:45:08 CEST


This is all the information about APD 1201012777. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1201012777
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 443 V
Voltage for Gain 100 (T=+25°C): 415 V
Dark current: 9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 304
Position in Box: 31
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 253
Position in grid: 3
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 415 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 414.9761934 V     T = -25 °C: 378.4339189 V
Voltage for Gain 150: T = +20 °C: 422.9645002 V     T = -25 °C: 386.3537516 V
Voltage for Gain 200: T = +20 °C: 427.4056683 V     T = -25 °C: 390.7498925 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.553363336 V-1     T = -25 °C: 4.426655823 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.919614645 V-1     T = -25 °C: 8.697663935 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.78066968 V-1     T = -25 °C: 15.06716785 V-1
Break-through voltage: T = +20 °C: 440.0015301 V     T = -25 °C: 406.4701804 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:33 CET jreher Updated box and position via API.
07. Oct 2020 15:45:08 CEST jreher Updated APD location via API.
11. Aug 2020 17:57:53 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:56 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:46 CEST jreher Updated box and position via API.
19. Dec 2019 16:20:00 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:22 CET jreher Updated box and position via API.
27. Oct 2017 10:38:42 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:29:49 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:53:38 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:27:52 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:37:48 CEST Tobias Imported from Hamamatsu datasheet.