RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0924010730 - Archived data from Tue, 11. August 2020 17:58:00 CEST


This is all the information about APD 0924010730. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0924010730
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.7 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 305
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 250
Position in grid: 17
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 19. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 378.7 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.1556632 V     T = -25 °C: 344.8061555 V
Voltage for Gain 150: T = +20 °C: 387.0844808 V     T = -25 °C: 352.2694786 V
Voltage for Gain 200: T = +20 °C: 391.5141508 V     T = -25 °C: 356.4353349 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.531929214 V-1     T = -25 °C: 5.526148771 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.868058212 V-1     T = -25 °C: 8.163865228 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.68341229 V-1     T = -25 °C: 14.31691162 V-1
Break-through voltage: T = +20 °C: 409.0965334 V     T = -25 °C: 371.7058568 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 15:06:22 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:20:39 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:27:39 CET jreher Updated box and position via API.
11. Aug 2020 17:58:00 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:10 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:01 CEST jreher Updated box and position via API.
19. Dec 2019 16:33:21 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:29 CET jreher Updated box and position via API.
20. Oct 2017 14:31:03 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:53:08 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:27:31 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:27:50 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:37:47 CEST Tobias Imported from Hamamatsu datasheet.