RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0924010725 - Archived data from Tue, 11. August 2020 17:57:59 CEST


This is all the information about APD 0924010725. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0924010725
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.1 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 305
Position in Box: 14
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 250
Position in grid: 9
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 19. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 379.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.6785294 V     T = -25 °C: 344.6693454 V
Voltage for Gain 150: T = +20 °C: 387.6092939 V     T = -25 °C: 352.089134 V
Voltage for Gain 200: T = +20 °C: 392.0128253 V     T = -25 °C: 356.2835858 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.374627261 V-1     T = -25 °C: 4.671456758 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.41193779 V-1     T = -25 °C: 9.406137632 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.51719479 V-1     T = -25 °C: 15.53493767 V-1
Break-through voltage: T = +20 °C: 407.7941289 V     T = -25 °C: 371.2605984 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:38 CET jreher Updated box and position via API.
11. Aug 2020 17:57:59 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:10 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:00 CEST jreher Updated box and position via API.
19. Dec 2019 16:33:20 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:28 CET jreher Updated box and position via API.
20. Oct 2017 14:31:03 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:53:08 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:27:31 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:27:31 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:37:46 CEST Tobias Imported from Hamamatsu datasheet.