RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0911009756 - Archived data from Fri, 05. February 2021 10:53:54 CET


This is all the information about APD 0911009756. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0911009756
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.7 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 44
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 208
Position in grid: 1
Arrival for irradiation: 12. Jul 2016
Sent for analysis after irradiation: 22. Jul 2016
Return for assembly: 19. Sep 2016
   
Irradiation:  
Date: 12. Jul 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 4
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 12. Jul 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.1255999 V     T = -25 °C: 343.7738542 V
Voltage for Gain 150: T = +20 °C: 387.0362363 V     T = -25 °C: 351.1369906 V
Voltage for Gain 200: T = +20 °C: 391.4202745 V     T = -25 °C: 355.2865561 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.526264814 V-1     T = -25 °C: 5.002093676 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.380120372 V-1     T = -25 °C: 9.332926289 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.32444797 V-1     T = -25 °C: 14.59212798 V-1
Break-through voltage: T = +20 °C: 406.8910095 V     T = -25 °C: 370.2383538 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2022 10:00:58 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:42:03 CET oafedulidis Updated box and position via API.
22. Feb 2021 11:10:51 CET jreher Updated box and position via API.
05. Feb 2021 10:53:54 CET jreher Updated box and position via API.
03. Feb 2021 18:19:41 CET jreher Updated box and position via API.
11. Aug 2020 17:26:55 CEST jreher Updated APD characteristics via API.
04. Aug 2020 15:48:20 CEST jreher Updated box and position via API.
27. Nov 2019 19:36:50 CET jreher Updated APD location via API.
25. Nov 2019 17:14:27 CET jreher Updated box and position via API.
04. Jul 2019 11:11:38 CEST jreher Updated APD location via API.
13. Jun 2019 10:01:31 CEST jreher Updated APD batch assignment via API.
23. Sep 2016 09:06:00 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:11:23 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:10:59 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 16:27:25 CEST markus.moritz Entered irradiation information.
02. Aug 2016 14:57:48 CEST christopher.l.hahn Entered annealing information.
01. Aug 2016 17:27:44 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:34:20 CEST Tobias Imported from Hamamatsu datasheet.