RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0910009731


This is all the information about APD 0910009731. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0910009731
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387.9 V
Dark current: 3.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 44
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: 10072
   
Shipment:  
Grid number: 207
Position in grid: 10
Arrival for irradiation: 15. May 2016
Sent for analysis after irradiation: 23. Jun 2016
Return for assembly: 20. Dec 2016
   
Irradiation:  
Date: 20. May 2016
Dose used: 57 Gy
Temperature: -25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 20. May 2016
Temperature: 80 °C
Duration: 8 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.625657 V     T = -25 °C: 351.4228287 V
Voltage for Gain 150: T = +20 °C: 395.5717796 V     T = -25 °C: 358.9964796 V
Voltage for Gain 200: T = +20 °C: 399.9889656 V     T = -25 °C: 363.2536537 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.532262948 V-1     T = -25 °C: 4.908534441 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.735301651 V-1     T = -25 °C: 9.615226496 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.83967177 V-1     T = -25 °C: 14.71436925 V-1
Break-through voltage: T = +20 °C: 414.906597 V     T = -25 °C: 378.0369303 V
   
Notes: has been irradiated and annealed again (sent to Gießen on 24_07_2018, irradiated on 16_08_2018 with 30Gy at 20°C, annealed on 17_08_2018 at 80°C for 48h, sent to analysis on 21_08_2018)


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
22. Feb 2021 11:10:50 CET jreher Updated box and position via API.
05. Feb 2021 10:53:52 CET jreher Updated box and position via API.
03. Feb 2021 18:19:40 CET jreher Updated box and position via API.
11. Aug 2020 17:26:53 CEST jreher Updated APD characteristics via API.
04. Aug 2020 15:48:19 CEST jreher Updated box and position via API.
27. Nov 2019 19:36:50 CET jreher Updated APD location via API.
25. Nov 2019 17:14:26 CET jreher Updated box and position via API.
04. Jul 2019 11:11:36 CEST jreher Updated APD location via API.
13. Jun 2019 10:01:13 CEST jreher Updated APD batch assignment via API.
21. Aug 2018 11:45:01 CEST markus.moritz
20. Dec 2016 10:37:11 CET markus.moritz Entered return for assembly date.
03. Aug 2016 16:10:39 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:10:26 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 16:26:46 CEST markus.moritz Entered irradiation information.
02. Aug 2016 15:17:47 CEST christopher.l.hahn Entered annealing information.
01. Aug 2016 17:52:07 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:34:20 CEST Tobias Imported from Hamamatsu datasheet.