RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0910009725 - Archived data from Tue, 11. August 2020 17:40:11 CEST


This is all the information about APD 0910009725. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0910009725
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 389.8 V
Dark current: 5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 289
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 207
Position in grid: 2
Arrival for irradiation: 15. May 2016
Sent for analysis after irradiation: 23. Jun 2016
Return for assembly: 20. Dec 2016
   
Irradiation:  
Date: 20. May 2016
Dose used: 57 Gy
Temperature: -25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 20. May 2016
Temperature: 80 °C
Duration: 8 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.1007269 V     T = -25 °C: 353.8075632 V
Voltage for Gain 150: T = +20 °C: 397.9652939 V     T = -25 °C: 361.3381422 V
Voltage for Gain 200: T = +20 °C: 402.3228645 V     T = -25 °C: 365.5729086 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.596629873 V-1     T = -25 °C: 4.926837698 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.091557865 V-1     T = -25 °C: 9.053894223 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.23056722 V-1     T = -25 °C: 16.05927434 V-1
Break-through voltage: T = +20 °C: 417.7772748 V     T = -25 °C: 381.1241564 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:34 CET jreher Updated box and position via API.
07. Oct 2020 15:44:48 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:11 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:31 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:38 CET jreher Updated APD location via API.
25. Nov 2019 17:31:23 CET jreher Updated box and position via API.
22. Oct 2019 14:31:14 CEST spankonin Updated APD location via API.
14. Oct 2019 17:33:21 CEST jgrochowski Updated APD batch assignment via API.
20. Dec 2016 10:37:11 CET markus.moritz Entered return for assembly date.
03. Aug 2016 16:10:39 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:10:26 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 16:26:46 CEST markus.moritz Entered irradiation information.
02. Aug 2016 15:17:47 CEST christopher.l.hahn Entered annealing information.
01. Aug 2016 17:52:06 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:34:20 CEST Tobias Imported from Hamamatsu datasheet.