RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0909009638 - Archived data from Tue, 11. August 2020 17:57:55 CEST


This is all the information about APD 0909009638. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0909009638
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.9 V
Dark current: 3.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 304
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 203
Position in grid: 4
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 384.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.5865482 V     T = -25 °C: 348.9384702 V
Voltage for Gain 150: T = +20 °C: 392.5756259 V     T = -25 °C: 356.3905035 V
Voltage for Gain 200: T = +20 °C: 397.0103739 V     T = -25 °C: 360.5912325 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.371278636 V-1     T = -25 °C: 4.913368687 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.398873416 V-1     T = -25 °C: 9.075823793 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.39458201 V-1     T = -25 °C: 16.02543736 V-1
Break-through voltage: T = +20 °C: 412.7612645 V     T = -25 °C: 376.0943045 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:34 CET jreher Updated box and position via API.
07. Oct 2020 15:45:09 CEST jreher Updated APD location via API.
11. Aug 2020 17:57:55 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:57 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:47 CEST jreher Updated box and position via API.
19. Dec 2019 16:20:25 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:23 CET jreher Updated box and position via API.
17. Nov 2017 09:39:37 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:38:24 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:26 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:54 CET Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:34:18 CEST Tobias Imported from Hamamatsu datasheet.