RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0907009473


This is all the information about APD 0907009473. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0907009473
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 289
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: 10201
   
Shipment:  
Grid number: 195
Position in grid: 17
Arrival for irradiation: 01. Jul 2016
Sent for analysis after irradiation: 08. Jul 2016
Return for assembly: 12. Sep 2016
   
Irradiation:  
Date: 05. Jul 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 05. Jul 2016
Temperature: 80 °C
Duration: 8 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.9448203 V     T = -25 °C: 343.7773344 V
Voltage for Gain 150: T = +20 °C: 386.8213808 V     T = -25 °C: 351.1173129 V
Voltage for Gain 200: T = +20 °C: 391.2136754 V     T = -25 °C: 355.2606784 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.596527449 V-1     T = -25 °C: 5.046767879 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.051376665 V-1     T = -25 °C: 9.375669988 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.97086371 V-1     T = -25 °C: 14.65402817 V-1
Break-through voltage: T = +20 °C: 406.483241 V     T = -25 °C: 370.5459227 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
05. Feb 2021 11:25:35 CET jreher Updated box and position via API.
07. Oct 2020 15:44:48 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:12 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:31 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:39 CET jreher Updated APD location via API.
25. Nov 2019 17:31:23 CET jreher Updated box and position via API.
22. Oct 2019 14:31:14 CEST spankonin Updated APD location via API.
14. Oct 2019 17:33:22 CEST jgrochowski Updated APD batch assignment via API.
05. Apr 2018 13:55:44 CEST jgrochowski
12. Sep 2016 09:53:25 CEST markus.moritz Entered return for assembly date.
04. Aug 2016 12:47:56 CEST markus.moritz Entered arrival for irradiation date.
04. Aug 2016 12:47:22 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:38:52 CEST tobias Resetted return for assembly date after accidental error.
03. Aug 2016 16:09:52 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:09:44 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:09:32 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 16:25:44 CEST markus.moritz Entered irradiation information.
02. Aug 2016 14:55:35 CEST christopher.l.hahn Entered annealing information.
01. Aug 2016 17:27:33 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:34:14 CEST Tobias Imported from Hamamatsu datasheet.