RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0907009464


This is all the information about APD 0907009464. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0907009464
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 398 V
Voltage for Gain 100 (T=+25°C): 371.2 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 195
Position in grid: 1
Arrival for irradiation: 01. Jul 2016
Sent for analysis after irradiation: 08. Jul 2016
Return for assembly: 12. Sep 2016
   
Irradiation:  
Date: 05. Jul 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 05. Jul 2016
Temperature: 80 °C
Duration: 8 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
12. Sep 2016 09:53:25 CEST markus.moritz Entered return for assembly date.
04. Aug 2016 12:47:55 CEST markus.moritz Entered arrival for irradiation date.
04. Aug 2016 12:47:22 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:38:52 CEST tobias Resetted return for assembly date after accidental error.
03. Aug 2016 16:09:52 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:09:44 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:09:32 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 16:25:44 CEST markus.moritz Entered irradiation information.
02. Aug 2016 14:55:35 CEST christopher.l.hahn Entered annealing information.
01. Aug 2016 17:27:32 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:34:14 CEST Tobias Imported from Hamamatsu datasheet.