RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0905009321 - Archived data from Fri, 05. February 2021 11:37:02 CET


This is all the information about APD 0905009321. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0905009321
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F13
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.2 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 380
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 190
Position in grid: 9
Arrival for irradiation: 10. Jun 2016
Sent for analysis after irradiation: 08. Jul 2016
Return for assembly: 11. Jul 2016
   
Irradiation:  
Date: 20. Jun 2016
Dose used: 37 Gy
Temperature: 25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 20. Jun 2016
Temperature: 80 °C
Duration: 8 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:03:08 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:37:02 CET jreher Updated box and position via API.
14. Oct 2020 15:55:10 CEST vwerner Updated APD batch assignment via API.
08. Oct 2020 18:19:58 CEST jreher Updated APD location via API.
03. Aug 2016 16:28:44 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:09:11 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:09:01 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 16:24:29 CEST markus.moritz Entered irradiation information.
02. Aug 2016 15:21:25 CEST christopher.l.hahn Entered annealing information.
01. Aug 2016 17:27:32 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:31:45 CEST Tobias Imported from Hamamatsu datasheet.