RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0904009255 - Archived data from Tue, 11. August 2020 17:27:50 CEST


This is all the information about APD 0904009255. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0904009255
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 54
Position in Box: 29
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.1716756 V     T = -25 °C: 347.4698388 V
Voltage for Gain 150: T = +20 °C: 391.0779007 V     T = -25 °C: 354.9156514 V
Voltage for Gain 200: T = +20 °C: 395.4855948 V     T = -25 °C: 359.1079847 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.35942048 V-1     T = -25 °C: 4.910812963 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.053248686 V-1     T = -25 °C: 9.67328785 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.28509062 V-1     T = -25 °C: 14.82975157 V-1
Break-through voltage: T = +20 °C: 410.6836989 V     T = -25 °C: 374.1884633 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:19 CET jreher Updated box and position via API.
03. Feb 2021 18:20:54 CET jreher Updated box and position via API.
11. Aug 2020 17:27:50 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:16 CET jreher Updated APD location via API.
25. Nov 2019 17:15:11 CET jreher Updated box and position via API.
04. Jul 2019 11:12:35 CEST jreher Updated APD location via API.
18. Jun 2019 13:26:32 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 13:27:09 CEST markus.moritz
22. Jun 2016 15:31:43 CEST Tobias Imported from Hamamatsu datasheet.