RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0904009247 - Archived data from Wed, 28. April 2021 13:28:11 CEST


This is all the information about APD 0904009247. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0904009247
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F12
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 388.1 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 294
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 186
Position in grid: 16
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 388.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.7212207 V     T = -25 °C: 352.0460056 V
Voltage for Gain 150: T = +20 °C: 395.7063996 V     T = -25 °C: 359.6548625 V
Voltage for Gain 200: T = +20 °C: 400.1418442 V     T = -25 °C: 363.8394178 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.631761684 V-1     T = -25 °C: 4.956349689 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.042905605 V-1     T = -25 °C: 10.39145999 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.04501443 V-1     T = -25 °C: 15.76526785 V-1
Break-through voltage: T = +20 °C: 415.3441867 V     T = -25 °C: 379.6078984 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:53:06 CEST oafedulidis Assigned to capsule by script
28. Apr 2021 13:28:11 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:26:14 CET jreher Updated box and position via API.
11. Aug 2020 17:56:15 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:29 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:19 CEST jreher Updated box and position via API.
19. Dec 2019 15:44:45 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:06 CET jreher Updated box and position via API.
17. Nov 2017 09:39:23 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:37:18 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:11 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:54 CET Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:31:43 CEST Tobias Imported from Hamamatsu datasheet.