RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0904009239 - Archived data from Thu, 09. November 2017 15:11:11 CET


This is all the information about APD 0904009239. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0904009239
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.4 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 294
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 186
Position in grid: 2
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:14 CET jreher Updated box and position via API.
11. Aug 2020 17:56:13 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:29 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:19 CEST jreher Updated box and position via API.
19. Dec 2019 15:44:45 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:05 CET jreher Updated box and position via API.
17. Nov 2017 09:39:23 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:37:17 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:11 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:54 CET Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:31:43 CEST Tobias Imported from Hamamatsu datasheet.