RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0902009168 - Archived data from Thu, 09. November 2017 15:11:05 CET


This is all the information about APD 0902009168. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0902009168
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 294
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 183
Position in grid: 17
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes: Wrong wafer number in serial number, correct wafer number is 3.


Version history

Time Author Change comment
16. Nov 2022 09:59:38 CET oafedulidis Assigned to capsule by script
05. Feb 2021 11:26:15 CET jreher Updated box and position via API.
11. Aug 2020 17:56:16 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:30 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:20 CEST jreher Updated box and position via API.
19. Dec 2019 15:44:46 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:06 CET jreher Updated box and position via API.
17. Nov 2017 09:39:16 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:38:13 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:05 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:53 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:03:46 CEST Tobias Added note about wrong wafer number.
22. Jun 2016 15:31:41 CEST Tobias Imported from Hamamatsu datasheet.