RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0902009164 - Archived data from Tue, 11. August 2020 17:56:15 CEST


This is all the information about APD 0902009164. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0902009164
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 294
Position in Box: 42
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 183
Position in grid: 9
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 381.7 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.6252405 V     T = -25 °C: 346.1845606 V
Voltage for Gain 150: T = +20 °C: 389.6191215 V     T = -25 °C: 353.6571051 V
Voltage for Gain 200: T = +20 °C: 394.0751067 V     T = -25 °C: 357.7964486 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.616031255 V-1     T = -25 °C: 5.475147845 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.015006854 V-1     T = -25 °C: 9.566222915 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.85741825 V-1     T = -25 °C: 15.09583606 V-1
Break-through voltage: T = +20 °C: 410.1930499 V     T = -25 °C: 373.5897126 V
   
Notes: Wrong wafer number in serial number, correct wafer number is 3.


Version history

Time Author Change comment
05. Feb 2021 11:26:15 CET jreher Updated box and position via API.
11. Aug 2020 17:56:15 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:29 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:20 CEST jreher Updated box and position via API.
19. Dec 2019 15:44:46 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:06 CET jreher Updated box and position via API.
17. Nov 2017 09:39:16 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:38:13 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:05 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:53 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:03:46 CEST Tobias Added note about wrong wafer number.
22. Jun 2016 15:31:41 CEST Tobias Imported from Hamamatsu datasheet.