RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0902009137 - Archived data from Tue, 06. October 2020 16:51:24 CEST


This is all the information about APD 0902009137. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0902009137
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.1 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 54
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.1878723 V     T = -25 °C: 349.0289543 V
Voltage for Gain 150: T = +20 °C: 393.1078545 V     T = -25 °C: 356.4927209 V
Voltage for Gain 200: T = +20 °C: 397.5067653 V     T = -25 °C: 360.6714784 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.461580092 V-1     T = -25 °C: 4.972423244 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.979663957 V-1     T = -25 °C: 8.917753059 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.05502406 V-1     T = -25 °C: 15.17713518 V-1
Break-through voltage: T = +20 °C: 413.3287119 V     T = -25 °C: 376.3734017 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:20 CET jreher Updated box and position via API.
03. Feb 2021 18:20:55 CET jreher Updated box and position via API.
07. Oct 2020 12:18:12 CEST jreher Assigned to capsule by script
06. Oct 2020 16:51:24 CEST jreher Updated box and position via API.
11. Aug 2020 17:27:52 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:17 CET jreher Updated APD location via API.
25. Nov 2019 17:15:11 CET jreher Updated box and position via API.
04. Jul 2019 11:12:36 CEST jreher Updated APD location via API.
18. Jun 2019 13:42:21 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 13:01:38 CEST markus.moritz
22. Jun 2016 15:31:41 CEST Tobias Imported from Hamamatsu datasheet.