RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0902009098 - Archived data from Tue, 11. August 2020 17:27:57 CEST


This is all the information about APD 0902009098. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0902009098
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 391.1 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 55
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.0972256 V     T = -25 °C: 354.818346 V
Voltage for Gain 150: T = +20 °C: 399.0104218 V     T = -25 °C: 362.4629909 V
Voltage for Gain 200: T = +20 °C: 403.3395208 V     T = -25 °C: 366.6633047 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.383789035 V-1     T = -25 °C: 4.800226397 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.69039723 V-1     T = -25 °C: 9.465169335 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.25218025 V-1     T = -25 °C: 15.0388717 V-1
Break-through voltage: T = +20 °C: 418.6740203 V     T = -25 °C: 382.2475932 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:25 CET jreher Updated box and position via API.
03. Feb 2021 18:20:59 CET jreher Updated box and position via API.
11. Aug 2020 17:27:57 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:26 CET jreher Updated APD location via API.
25. Nov 2019 17:15:14 CET jreher Updated box and position via API.
04. Jul 2019 11:12:42 CEST jreher Updated APD location via API.
18. Jun 2019 13:42:22 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 13:15:14 CEST markus.moritz
22. Jun 2016 15:31:40 CEST Tobias Imported from Hamamatsu datasheet.