RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0901009050 - Archived data from Tue, 11. August 2020 17:28:10 CEST


This is all the information about APD 0901009050. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0901009050
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 386.6 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 56
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.9520483 V     T = -25 °C: 351.0017479 V
Voltage for Gain 150: T = +20 °C: 394.92987 V     T = -25 °C: 358.5330549 V
Voltage for Gain 200: T = +20 °C: 399.3731063 V     T = -25 °C: 362.7973492 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.408125449 V-1     T = -25 °C: 4.682526506 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.170394888 V-1     T = -25 °C: 9.081499248 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.80367078 V-1     T = -25 °C: 15.28473268 V-1
Break-through voltage: T = +20 °C: 415.2566997 V     T = -25 °C: 378.4177503 V
   
Notes: impurity on surface that could not be removed fully with alcohol


Version history

Time Author Change comment
05. Feb 2021 10:55:36 CET jreher Updated box and position via API.
03. Feb 2021 18:21:10 CET jreher Updated box and position via API.
11. Aug 2020 17:28:10 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:38 CET jreher Updated APD location via API.
25. Nov 2019 17:15:20 CET jreher Updated box and position via API.
04. Jul 2019 11:12:51 CEST jreher Updated APD location via API.
24. Jun 2019 13:01:50 CEST jgrochowski Updated APD batch assignment via API.
18. Jun 2019 14:08:13 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 13:24:45 CEST markus.moritz
22. Jun 2016 15:31:38 CEST Tobias Imported from Hamamatsu datasheet.