RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0901009040 - Archived data from Fri, 05. February 2021 10:55:44 CET


This is all the information about APD 0901009040. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0901009040
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 388.4 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 52
Position in Box: 49
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.7722563 V     T = -25 °C: 353.0645616 V
Voltage for Gain 150: T = +20 °C: 396.7566815 V     T = -25 °C: 360.6578566 V
Voltage for Gain 200: T = +20 °C: 401.2059017 V     T = -25 °C: 364.9169711 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.425341245 V-1     T = -25 °C: 5.027077359 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.509897937 V-1     T = -25 °C: 8.920553142 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 12.78421658 V-1     T = -25 °C: 15.69228035 V-1
Break-through voltage: T = +20 °C: 405.2911953 V     T = -25 °C: 380.9354253 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:48:28 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:55:44 CET jreher Updated box and position via API.
03. Feb 2021 18:21:17 CET jreher Updated box and position via API.
11. Aug 2020 17:28:20 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:49 CET jreher Updated APD location via API.
25. Nov 2019 17:15:25 CET jreher Updated box and position via API.
04. Jul 2019 11:12:59 CEST jreher Updated APD location via API.
03. Jul 2019 18:43:29 CEST jreher Updated APD batch assignment via API.
24. Jun 2019 13:02:36 CEST jgrochowski Updated APD batch assignment via API.
18. Jun 2019 14:19:32 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 13:31:27 CEST markus.moritz
22. Jun 2016 15:31:38 CEST Tobias Imported from Hamamatsu datasheet.