Show Hamamatsu Avalanche Photo Diode 0901009033 - Archived data from Wed, 03. February 2021 18:21:16 CET
This is all the information about APD 0901009033. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 0901009033 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E08 |
Break-through voltage: | 411 V |
Voltage for Gain 100 (T=+25°C): | 382.9 V |
Dark current: | 5.6 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 57 |
Position in Box: | 24 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 18. Apr 2019 |
Sent for analysis after irradiation: | 04. Jun 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 29. May 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 29. May 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 382.9395403 V T = -25 °C: 347.5210035 V |
Voltage for Gain 150: | T = +20 °C: 390.8664135 V T = -25 °C: 354.8838204 V |
Voltage for Gain 200: | T = +20 °C: 395.3368209 V T = -25 °C: 359.0720796 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.575386039 V-1 T = -25 °C: 4.671627443 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.368327452 V-1 T = -25 °C: 9.817444305 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.31902621 V-1 T = -25 °C: 14.42567711 V-1 |
Break-through voltage: | T = +20 °C: 411.2271638 V T = -25 °C: 374.6275504 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
29. Apr 2021 17:04:36 CEST | oafedulidis | Assigned to capsule by script |
16. Feb 2021 12:26:10 CET | jreher | Updated box and position via API. |
05. Feb 2021 10:55:43 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:21:16 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:28:18 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:38:49 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:15:24 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:12:58 CEST | jreher | Updated APD location via API. |
03. Jul 2019 18:43:28 CEST | jreher | Updated APD batch assignment via API. |
24. Jun 2019 13:02:36 CEST | jgrochowski | Updated APD batch assignment via API. |
18. Jun 2019 14:19:32 CEST | jgrochowski | Updated APD batch assignment via API. |
04. Jun 2019 13:36:02 CEST | markus.moritz | |
22. Jun 2016 15:31:38 CEST | Tobias | Imported from Hamamatsu datasheet. |