RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0823009029 - Archived data from Fri, 05. February 2021 11:26:07 CET


This is all the information about APD 0823009029. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0823009029
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.8 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 293
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.2517272 V     T = -25 °C: 343.1598504 V
Voltage for Gain 150: T = +20 °C: 386.0680943 V     T = -25 °C: 350.4663223 V
Voltage for Gain 200: T = +20 °C: 390.4254112 V     T = -25 °C: 354.5634992 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.526749677 V-1     T = -25 °C: 4.920630038 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.922561704 V-1     T = -25 °C: 9.095882101 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.64812118 V-1     T = -25 °C: 16.25847184 V-1
Break-through voltage: T = +20 °C: 401.1925541 V     T = -25 °C: 369.9102607 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 15:12:27 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:20:23 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:26:07 CET jreher Updated box and position via API.
11. Aug 2020 17:42:00 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:12 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:23 CET jreher Updated APD location via API.
25. Nov 2019 17:31:43 CET jreher Updated box and position via API.
11. Nov 2019 15:43:05 CET spankonin Updated APD location via API.
18. Oct 2019 14:14:35 CEST jgrochowski Updated APD batch assignment via API.
07. Aug 2019 13:26:01 CEST markus.moritz
22. Jun 2016 15:29:45 CEST Tobias Imported from Hamamatsu datasheet.