RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0823009000 - Archived data from Tue, 06. October 2020 16:52:13 CEST


This is all the information about APD 0823009000. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0823009000
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.4 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 191
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5765229 V     T = -25 °C: 346.9067759 V
Voltage for Gain 150: T = +20 °C: 390.443994 V     T = -25 °C: 354.322868 V
Voltage for Gain 200: T = +20 °C: 394.8013127 V     T = -25 °C: 358.5030514 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.400319737 V-1     T = -25 °C: 4.940663955 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.550733991 V-1     T = -25 °C: 9.101287186 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.84052704 V-1     T = -25 °C: 16.07486667 V-1
Break-through voltage: T = +20 °C: 409.8665236 V     T = -25 °C: 373.6769965 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:12:59 CET jreher Updated box and position via API.
29. Jan 2021 10:24:45 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:13 CEST jreher Updated box and position via API.
11. Aug 2020 17:35:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:02:50 CET jreher Updated APD location via API.
25. Nov 2019 17:25:55 CET jreher Updated box and position via API.
16. Aug 2019 12:20:26 CEST jreher Updated APD location via API.
09. Aug 2019 17:00:34 CEST spankonin Updated APD batch assignment via API.
09. Aug 2019 10:47:20 CEST markus.moritz
22. Jun 2016 15:29:44 CEST Tobias Imported from Hamamatsu datasheet.