RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0823008953 - Archived data from Tue, 06. October 2020 16:52:46 CEST


This is all the information about APD 0823008953. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0823008953
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.7 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 201
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.7825679 V     T = -25 °C: 348.8244895 V
Voltage for Gain 150: T = +20 °C: 392.6765008 V     T = -25 °C: 356.3188609 V
Voltage for Gain 200: T = +20 °C: 397.0545521 V     T = -25 °C: 360.5393666 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.665971324 V-1     T = -25 °C: 4.912169402 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.184024933 V-1     T = -25 °C: 9.032180459 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.34166907 V-1     T = -25 °C: 15.86929512 V-1
Break-through voltage: T = +20 °C: 412.2742367 V     T = -25 °C: 376.1105 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:21 CET jreher Updated box and position via API.
29. Jan 2021 10:23:36 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:46 CEST jreher Updated box and position via API.
11. Aug 2020 17:36:36 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:04:42 CET jreher Updated APD location via API.
25. Nov 2019 17:26:44 CET jreher Updated box and position via API.
13. Aug 2019 14:50:33 CEST spankonin Updated APD batch assignment via API.
08. Aug 2019 14:52:29 CEST markus.moritz
22. Jun 2016 15:29:43 CEST Tobias Imported from Hamamatsu datasheet.