RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0822008944 - Archived data from Tue, 11. August 2020 17:36:52 CEST


This is all the information about APD 0822008944. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0822008944
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.5 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 197
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.7448501 V     T = -25 °C: 352.8029235 V
Voltage for Gain 150: T = +20 °C: 396.7163069 V     T = -25 °C: 360.3833155 V
Voltage for Gain 200: T = +20 °C: 401.1360755 V     T = -25 °C: 364.6473664 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.595409013 V-1     T = -25 °C: 4.869023867 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.074442205 V-1     T = -25 °C: 8.817164092 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.03601219 V-1     T = -25 °C: 15.31961524 V-1
Break-through voltage: T = +20 °C: 417.1203049 V     T = -25 °C: 380.6219992 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:13:50 CET jreher Updated box and position via API.
11. Aug 2020 17:36:52 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:58 CET jreher Updated APD location via API.
25. Nov 2019 17:26:25 CET jreher Updated box and position via API.
13. Aug 2019 14:51:45 CEST spankonin Updated APD batch assignment via API.
08. Aug 2019 14:48:10 CEST markus.moritz
22. Jun 2016 15:29:43 CEST Tobias Imported from Hamamatsu datasheet.