RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0822008931 - Archived data from Tue, 06. October 2020 16:51:52 CEST


This is all the information about APD 0822008931. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0822008931
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.4 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 197
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.5911025 V     T = -25 °C: 349.5553981 V
Voltage for Gain 150: T = +20 °C: 393.481279 V     T = -25 °C: 356.9762182 V
Voltage for Gain 200: T = +20 °C: 397.838979 V     T = -25 °C: 361.1420353 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.402982739 V-1     T = -25 °C: 4.683831042 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.528495186 V-1     T = -25 °C: 9.4106301 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.80792222 V-1     T = -25 °C: 14.78747255 V-1
Break-through voltage: T = +20 °C: 412.4416562 V     T = -25 °C: 375.9885663 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:13:49 CET jreher Updated box and position via API.
08. Dec 2020 17:10:56 CET jreher Assigned to capsule by script
06. Oct 2020 16:51:52 CEST jreher Updated box and position via API.
11. Aug 2020 17:36:50 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:57 CET jreher Updated APD location via API.
25. Nov 2019 17:26:24 CET jreher Updated box and position via API.
13. Aug 2019 14:51:44 CEST spankonin Updated APD batch assignment via API.
08. Aug 2019 14:43:28 CEST markus.moritz
22. Jun 2016 15:29:43 CEST Tobias Imported from Hamamatsu datasheet.