RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0822008923 - Archived data from Fri, 05. February 2021 11:13:48 CET


This is all the information about APD 0822008923. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0822008923
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 197
Position in Box: 21
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.1269527 V     T = -25 °C: 348.6932596 V
Voltage for Gain 150: T = +20 °C: 392.0554627 V     T = -25 °C: 356.0681098 V
Voltage for Gain 200: T = +20 °C: 396.4710481 V     T = -25 °C: 360.2205592 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.523141948 V-1     T = -25 °C: 5.044908195 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.844500714 V-1     T = -25 °C: 9.365024687 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.40010078 V-1     T = -25 °C: 14.74517876 V-1
Break-through voltage: T = +20 °C: 412.0848665 V     T = -25 °C: 375.6749751 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:24:41 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:13:10 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:13:48 CET jreher Updated box and position via API.
11. Aug 2020 17:36:49 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:57 CET jreher Updated APD location via API.
25. Nov 2019 17:26:23 CET jreher Updated box and position via API.
13. Aug 2019 14:51:44 CEST spankonin Updated APD batch assignment via API.
08. Aug 2019 14:49:13 CEST markus.moritz
22. Jun 2016 15:29:43 CEST Tobias Imported from Hamamatsu datasheet.