RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0820008798 - Archived data from Tue, 11. August 2020 17:35:37 CEST


This is all the information about APD 0820008798. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0820008798
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.2 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 195
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.3512483 V     T = -25 °C: 350.0417677 V
Voltage for Gain 150: T = +20 °C: 394.2298998 V     T = -25 °C: 357.5381412 V
Voltage for Gain 200: T = +20 °C: 398.5891069 V     T = -25 °C: 361.7347002 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.416022697 V-1     T = -25 °C: 4.847464288 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.59820367 V-1     T = -25 °C: 9.620010923 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.83993089 V-1     T = -25 °C: 15.15258714 V-1
Break-through voltage: T = +20 °C: 413.7951152 V     T = -25 °C: 377.0875929 V
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 14:20:29 CEST jreher Assigned to capsule by script
16. Feb 2021 12:28:31 CET jreher Updated box and position via API.
05. Feb 2021 11:13:29 CET jreher Updated box and position via API.
11. Aug 2020 17:35:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:33 CET jreher Updated APD location via API.
25. Nov 2019 17:26:12 CET jreher Updated box and position via API.
16. Aug 2019 12:10:27 CEST spankonin Updated APD location via API.
09. Aug 2019 17:02:11 CEST spankonin Updated APD batch assignment via API.
08. Aug 2019 12:11:36 CEST markus.moritz
22. Jun 2016 15:29:40 CEST Tobias Imported from Hamamatsu datasheet.