RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0820008762 - Archived data from Tue, 06. October 2020 16:52:56 CEST


This is all the information about APD 0820008762. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0820008762
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.9 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 202
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.3843149 V     T = -25 °C: 349.3810314 V
Voltage for Gain 150: T = +20 °C: 393.3085207 V     T = -25 °C: 356.8359836 V
Voltage for Gain 200: T = +20 °C: 397.6960737 V     T = -25 °C: 361.0354407 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.354412467 V-1     T = -25 °C: 4.687172702 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.273228551 V-1     T = -25 °C: 9.348763322 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.30747831 V-1     T = -25 °C: 14.4287863 V-1
Break-through voltage: T = +20 °C: 413.1149378 V     T = -25 °C: 376.4841512 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:28 CET jreher Updated box and position via API.
07. Oct 2020 12:19:30 CEST jreher Assigned to capsule by script
06. Oct 2020 16:52:56 CEST jreher Updated box and position via API.
11. Aug 2020 17:36:43 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:04:52 CET jreher Updated APD location via API.
25. Nov 2019 17:26:48 CET jreher Updated box and position via API.
13. Aug 2019 14:51:02 CEST spankonin Updated APD batch assignment via API.
31. Jul 2019 14:26:15 CEST markus.moritz
22. Jun 2016 15:29:39 CEST Tobias Imported from Hamamatsu datasheet.