RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0820008761 - Archived data from Tue, 11. August 2020 17:36:43 CEST


This is all the information about APD 0820008761. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0820008761
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.1 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 202
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.885969 V     T = -25 °C: 347.9734834 V
Voltage for Gain 150: T = +20 °C: 391.7843972 V     T = -25 °C: 355.406621 V
Voltage for Gain 200: T = +20 °C: 396.1731158 V     T = -25 °C: 359.5621642 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.517317839 V-1     T = -25 °C: 4.805944243 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.795356656 V-1     T = -25 °C: 9.692003426 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.23391028 V-1     T = -25 °C: 15.15489379 V-1
Break-through voltage: T = +20 °C: 411.0318656 V     T = -25 °C: 374.6669937 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:27 CET jreher Updated box and position via API.
07. Oct 2020 12:09:38 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:19 CEST jreher Updated box and position via API.
11. Aug 2020 17:36:43 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:04:52 CET jreher Updated APD location via API.
25. Nov 2019 17:26:48 CET jreher Updated box and position via API.
13. Aug 2019 14:51:02 CEST spankonin Updated APD batch assignment via API.
31. Jul 2019 14:24:58 CEST markus.moritz
22. Jun 2016 15:29:39 CEST Tobias Imported from Hamamatsu datasheet.